Case Study :: Medlock Secondary School, Manchester
Scope: Bulk Excavation, Remediation, Piling Mat Construction
Client : Amec Construction
Manchester Tippers reduced and levelled the site for the new Medlock Secondary School in Ardwick.
Following bulk excavation, the site was backfilled with recycled aggregates from the processing of the 5000m3 of excavated sands, gravels and soils, ahead of piling mat construction.
Case Study :: Radclyffe Secondary School, Oldham
Scope: Bulk Excavation, Remediation, Piling Mat Construction
Client : Kier North West
For this £30 million scheme comprising the construction of a new secondary school in Radcliffe, Manchester Tippers were employed by Kier NW to carry out bulk excavation and piling mat works.
20,000m3 of spoli was removed and recycled by us to import 10,000 tonnes of recycled 6F5 aggregate back into the site construction.




Many of today’s construction projects require bulk excavations, reduced digs or excavation works for ground beam construction. Heavy temperamental and top heavy piling rigs require well constructed and compacted pile carpets, and it is not unusual that both requirements are awarded to the same contractor.
Manchester Tippers have a comprehensive fleet of liveried modern plant and vehicles which are able to take on and complete any size of contract.
Contract management, safety documentation and evidence of training, competent and qualified operators and drivers with reliability and competitiveness BUILT IN.