Case Study :: Adelphi Street Mixed Development, Salford
Scope: Bulk Excavation, Land Remediation, Piling Platform
Client : Vermont Developments
Manchester Tippers met the challenge set by clients Vermont Developments to excavate this site to 4m below ground level and remove the spoil material.
Following completion of these works, a geogrid consisting of 600 compacted layers, together with a recycled 6F5 piling mat was installed to form a piling platform for this new commercial and residential development.
Case Study :: Middleton Leisure Centre, Manchester
Scope: Bulk Excavation, Remediation, Piling Mat Construction
Client : Barr Construction for Tesco
The project consisted of a new leisure centre to be constructed on the site of the former Middleton Arena, scheduled for demolition to make way for a new Tesco store.
Originally as gas works, then a waste recycling centre, the site required specislist excavation and remediation skills from Manchester Tippers. Large obstacles were removed ahead of site levelling and piling mat construction.
Manchester Tippers have a wealth of experience and proven ability to be able to advise all customers with regards to excavation applications, correct disposal methods at the most competitive rates in full compliance with all current Waste Regulations and Legislation.
In today’s marketplace, urban regeneration and brownfield sites have their own intrinsic problems and often require extensive and costly remediation of contaminated land to allow the re-development of the site.
We have an extensive fleet of plant and vehicles, and along with an all-inclusive range of recycled products; are able to offer all customers a full and comprehensive service which will allow contaminated sites to be fully remediated within critical programme cycles, and key dates and cost budgets.